top of page

TEMPORARY WORKS DESIGN BRIEF

Temporary works scheme details (Description of purpose of temporary works)

Competent person to write detailed brief of what is required here, i.e. manager, engineer, TWC, TWS , supervisor.

 

Include reference to drawings/ sketches/ specifications where relevant.
 

Project team specifications including; procurement preferences, supplier/ manufacturer for proprietary products, material preferences.
 

Consider tie-ins and effects on permanent works.

Explain special load cases, i.e. wind load case.

Section 2: Geotechnical information
 
Next Section →
bottom of page